Reel 17427 - Page 1688
- Title
- Reel 17427 - Page 1688
- Description
- Quality Score: unknown
Needs Review: No
OCR Confidence: 0%
Character Count: 1077
Word Count: 198 - Source
- https://image-uab.canadiana.ca/iiif/2/69429%2Fc0f47gr9q649/full/max/0/default.jpg
- Date
- 1941/1945
- Rights
- Public Domain
- Format
- image/jpeg
- Language
- fra
Dublin Core
- Text
- B. Outer harbor in Halong Bay.
(1) A channel dredged along the coast flat least?) 4 meters
( 2960 meters long. A volume of 275,000 cubic meters was taken out
(Tas measured?) in barges. Work stopped following the bombing raid
of 12 July 1943. (The dredge was sunk by a bomb --7K-- repairs, heavy
damage sustained).
Projects --SH-- cement --G-- enable construction of the
dock to be undertaken as planned. Work at present is limited to the
arrangement for barges, classifiable as --4K-- one barge --G-- and 6
hectares (for the earth platform?) and ...A
*The end of the second part is unreadable.
a - SSA no 119979.
b - "Casier." In this and other messages the word has seemed to have such
a meaning, though the dictionaries do not give anything similar.
c - As in text.
d - First part not available; parts H-9 - SSA no 98206; part 10 available
if requested.
e - Or "over," or "on."
f - This might also be "a little less than."
Inter 19 July 44
Rec'd 26 July 44
Trans 5 Aug. 44
Rec'd Ottawa Aug. 12, 1944.
File: D-5313
Examination Unit
National Research Council
August 14, 1944.
Text Item Type Metadata
Collection
Citation
“Reel 17427 - Page 1688,” The Canadian Vichy Intercepts, accessed December 26, 2025, http://omeka.uottawa.ca/examination-unit/items/show/19282.
Position: 944 (1 views)